Scouring Mass
Raw greasy wool contains non-wool contaminants that must be removed through aqueous washing to reveal the usable fibre mass. Commercial contracts determine clean yield by expressing the weight of oven-dry wool fibre, adjusted to a standard regain, as a percentage of the original greasy fleece weight. Processing plants calculate this figure to establish raw material valuation prior to topmaking.
Moisture Allowance
Commercial transactions require standardized allowances for moisture, residual grease and vegetable matter. Calculating clean yield under International Wool Textile Organisation rules incorporates an official regain percentage, typically sixteen point two five percent for scoured wool, ensuring trade uniformity across international ports. When greasy wool is sampled, core extracts undergo laboratory washing to isolate pure keratin from sand and waxes.
The resulting dry mass is then adjusted mathematically to simulate commercial processing conditions.
Valuation Standard
Wool buyers base auction bids directly on tested yield figures rather than raw greasy weights. Because greasy fleeces vary significantly in suint content and dirt loading, clean yield provides the financial basis for converting raw auction lots into clean equivalent prices. A lot weighing ten thousand kilograms with a tested yield of sixty percent yields six thousand kilograms of clean fibre.
Buyers apply this ratio to calculate yield-adjusted bidding limits during raw material procurement, ensuring accurate cost allocations across spinning lots.
Impurity Boundary
Standard testing methodologies isolate vegetable matter such as seeds and twigs before final mass determination. Clean yield calculations subtract this vegetable contamination along with residual grease remaining after laboratory solvent extraction. The measurement stops at the boundary of clean scoured wool, excluding downstream fibre loss during carding and combing.
Processing losses from short fibre breakage during mechanical alignment fall outside this test parameter, requiring separate top-and-noil yield assessments.